常见问题



主题 Modelling Tips

问题 最近一次修改
1
answer
How to Model a Grounding System with a Large Number of Conductor Segments
最近一次修改: 12月 06, 2004
2004/12/06
1
answer
Using MALZ/HIFREQ to Model Fall-of-Potential Grounding System Impedance Measurements
最近一次修改: 12月 06, 2004
2004/12/06
1
answer
Computing Step Voltages Correctly
最近一次修改: 12月 06, 2004
Overestimating, Not Underestimating, Profile Point Spacing
2004/12/06
1
answer
Distribution of Observation Points for the Computation of Touch-Voltages.
最近一次修改: 12月 06, 2004
2004/12/06
1
answer
Modelling Reinforced Concrete Foundations
最近一次修改: 9月 09, 2016
2016/09/09
1
answer
Modelling Insulators in HIFREQ
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Modelling of Building Foundations
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Large Touch Voltages in "High Over Low" Soil
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Modelling a Conductor Bundle in HIFREQ
最近一次修改: 12月 06, 2004
2004/12/06
1
answer
Computing Magnetic Fields Around Buried Cables
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Modelling a Grounding Grid with a Known Impedance in HIFREQ
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Modelling Retardation Effects in HIFREQ/FFTSES
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Reducing the Run Time of MALT and MALZ
最近一次修改: 12月 03, 2004
Computation Speed
2004/12/03
1
answer
Modelling coated plates in MALZ / HIFREQ
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Modelling a Realistic Square Wave Transient in FFTSES
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Currents on Non-Faulted Phases in a Fault Scenario
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Approximating Non-Circular Conductors
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Effects of Soil Ionization
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Modelling Cables in HIFREQ
最近一次修改: 4月 27, 2011
2011/04/27
1
answer
Modelling a Fence in MALT
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Modelling Flat Conductors (Strip)
最近一次修改: 12月 02, 2004
2004/12/02
1
answer
Modelling an ACSR conductor in HIFREQ
最近一次修改: 12月 03, 2004
2004/12/03
1
answer
Modelling a Concrete Floor
最近一次修改: 9月 09, 2016
2016/09/09
1
answer
Improving the computation time in Right-of-Way
最近一次修改: 2月 04, 2005
Computation time, ROW
2005/02/04
1
answer
Modeling a dummy conductor but not a dummy phase
最近一次修改: 2月 04, 2005
dummy conductor, dummy phase
2005/02/04
1
answer
Using Monitor Fault module for a system without neutral wires
最近一次修改: 2月 07, 2005
Monitor Fault, neutral wires
2005/02/07
1
answer
Modeling a moving train in Right-of-Way
最近一次修改: 2月 07, 2005
rail-to-rail, train, insulating joints, GPR
2005/02/07
1
answer
Using uniform soil model versus two-layer soil model in Right-of-Way
最近一次修改: 2月 07, 2005
uniform soil, two-layer soil, model
2005/02/07
1
answer
Computing the pipeline coating stress voltage
最近一次修改: 2月 07, 2005
coating stress voltage, pipeline, GPR, coating resistance
2005/02/07
1
answer
Modeling ballast as a coating in MALZ
最近一次修改: 2月 07, 2005
ballast, rail, coating resistivity
2005/02/07
1
answer
How Do You Model Backfill Material Around a Conductor?
最近一次修改: 12月 30, 2009
Backfill, Bentonite, Ground Enhancement Material, Earth Enhancement Material
2009/12/30
1
answer
How to Specify a Monopole or Downlead in the Transmission Line Section of SESShield
最近一次修改: 1月 15, 2010
SES-Shield, SES Shield, Cylindrical Conductor, Surge Impedance
2010/01/15